Kazui Master Bath Remodel
Client wanted a total upgrade. They had water damage from bad work done in past years so we removed all the damage and built the shower floor from the ground up. We removed the right shower wall and replaced it with glass to give an open feel to the shower.
We removed the stand alone tub and replaced that with a platform soaker tub that ends with a nice bench in the shower area. Finally we replaced the vanity and storage with a large vanity with more counter space for two people.





